We are pleased to present the Production Approval Certificate validated yesterday by the Authorities for the manufacture of our aircraft. The first deliveries will take place in a few weeks.
News Robin
Production Approval Certificate – September 2024
By Médéric Bernard Official Sep 25, 2024
Official release – June 2024
By Médéric Bernard Official Jun 13, 2024
To download the official release, please click here. https://ad.easa.europa.eu/ad/2023-0048-CN
When we get to this off-the-way workshop, the first thing you can smell is glue. But the most striking thing remains the sight of those two astronaut silhouettes in T-shirts cutting and sawing around. Like tailors from outer space. Short sleeves and full face helmet attached by a tube to a futuristic belt, the[…]
This is where it all begun. Back then, there was just dirt, weeds, a few trees and a few farms, sprinkled along one single road, connecting Dijon to Troyes, passing by the great nothing that was Darois. So here we are. Right where was built, in 1957, this half-barrel-shaped hangar that was meant to harbour[…]
Someone rings the handbell in the workshops. New order coming in! A new plane is soon going be emerging, piece by piece, from every workbench. The order passes through the fine sieve of the IT system. Printers are already warm. The manufacturing orders – « OF’s » for « Ordre de Fabrication » – are now sprinkling all over[…]
Saga Robin – Episode #6 – French Maroquinerie (Upholstery)
By Casimir Pellissier Official Feb 21, 2020
At the bottom of the Darois assembly workshops, we can smell leather. There’s actually every colors, kinds and sizes of leather. The wide refined cow skins share space with all kinds of mosses, stuffs, metal structures, sewing threads and patterns to straighten all this out. For most of us, it would look like a mess.[…]